Home                                        Prolog version 4.
Multiple Templates in the Same Job
 
Version 4.1 allows you to store more than one type of data set with each hole. For example you can have lithology data stored as well as defects. There are no limits to the number of templates and the names of the different templates stored with the hole.
The menu items to create, rename and delete these additional templates are found under the setup menu. To change the template currently displayed; select the new data template from the drop down combo box found in the icon bar near the top of the screen. The picture below shows the CoalLogSample data and here we have 6 different templates:
 
  • Geologists Data
  • Casing Data
  • Cementing Data
  • Drilling Data
  • Lithlogy Data
  • Water Flow Data
  • Point Load Data
  • Defect Data
 
 
 
 

Made with help of DrExplain

Prolog version 4